PREFABRICATED WALLS

 

Whether you’re building a house, garage, town home, duplex, a basement, or apartments, Stimpert’s quality prefabricated walls will reduce time of construction and waste.

CUSTOM HOME DESIGN

 

Stimpert staff will assist you in designing your dream home. From drafting your concept, developing construction-ready blueprints, to selecting all the necessary amenities, we have all your bases covered.

REMODELING

 


Remodeling projects include roofs, decks, additions, kitchens, doors, windows, and more. Whatever your remodeling needs, Stimpert has quality products that will enhance your home.

Less time, reduced cost, and quality workmanship.

TRULY SQUARE
CONSTRUCTION

We use factory made and air
powered jigs that square up walls
so construction in precise and
accurate beyond measure.

CONTROLLED
ENVIRONMENT

Stimpert’s climate-controlled
environment eliminates warping
in lumber and provides a clean
work environment.

Stimperts - Benefits - Quality Control

RIGOROUS QUALITY
CONTROL

Our quality control experts assure
the best stud construction,
header positioning, & back on
all our prefab walls.

Stimpert - Cut Time

CUTS CONSTRUCTION
TIME IN FIELD

Utilizing Stimpert prefab walls
can cut construction time in the
field by up to 50 percent and
eliminates waste materials.

Stimpert has been providing quality prefabricated wall construction for four generations.

CHARLES AND SENA STIMPERT MOVE TO SPRINGFIELD, MN.

1932

The Stimperts start a small cabinet business on their farm and build their first house using prefabricated walls.

BUSINESS EXPANDS

1946

Stimpert opens a production facility in Sleepy Eye, MN. They build both commercial and residential dwellings in their new facility. Prefabricated wall panel manufacturing line developed.

STIMPERT EMPLOYS WWII VETS

1947

In support of the returning troops, Stimpert offers vets employment opportunities in carpentry, welding, and other trades.

ADDITIONAL FACILITY ERECTED

1951

Stimpert purchases an existing cabinet shop in New Ulm, MN and installs another prefabricated wall manufacturing line.

STIMPERT DOUBLES IN SIZE

1959

Stimpert builds three new facilities on their existing site in Sleepy Eye, MN. They currently employ 25 people.

BUSINESS INCORPORATES

1953

Arnold Stimpert, son of Charles and Sena, buys the business. Arnold and his wife Margaret are the new owners.

ARNOLD AND MARGARET’S SONS JOIN BUSINESS

1956

Gerold and Merton, sons of Arnold and Margaret, join business and become share holders.

1958 – 1980: BUSINESS FLOURISHES

1958

Stimpert flourishes during this period as a result of the self-help program, G.I. loans, FHA and HUD programs.

HOUSING MARKET SLOWS DOWN

1981

As a result of high interest rates and a downturn in the economy, the housing market slows down. Stimpert begins building farm structures and large custom homes.

1988 – 2010: STRONG RESURGENCE IN HOUSING MARKET

1988

During this period of strong growth, Stimpert leadership changes. Merton and Gerald bring their sons, Dean and Mike, aboard. Market expands to include all of MN, WI, IA, and the Dakotas.

EXPANDED SERVICES OFFERED

Today

Stimpert expands services to include remodeling. Prefabricated wall manufacturing and custom designed homes continue.

Rambler with wood foundation 2017

Two Story Farm House 2017

4 bedroom, 2 1/2 stall garage, 2 story farm house. 

Patio Home 2017

Patio Home with a two story great room ceiling with loft, bed and bath upstairs

Angled Rambler 2017

We can build your dream home.